Microcontroller based device, aimed for managing the mains (and the relative circuit breaker) in applications composed by multiple generators operating in parallel. Multiple MC400 controllers are allowed for each system, to manage multiple mains.

MC400 performs a continuous check of the mains voltages characteristics; in case of anomalous voltages, it can immediately operate on the MCB circuit breaker (loads protection from abnormal mains voltages) and start the generators to supply the loads (AMF function).
When the mains returns in correct conditions, it allows the gensets synchronization to the mains (“reverse synchronization”), avoiding a blackout on the loads (“short time parallel”).

While the generators are in parallel to mains, MC400 continuously checks the mains to detect any faults, (interface protection): in case of anomalies, it opens the MCB circuit breaker to isolate the generators from the mains.

  • The centralization of the start/stop commands towards the generators.
  • An internal synchronizer with voltage, frequency and phase differences control.
  • The centralized management of active power setpoints for the generators, to allow the gradual transfer of the loads with a specifiable rate.
  • The centralized management of power factor setpoints for the generators, when operating in parallel with the mains.
  • The production in parallel to mains at fixed power (BASE LOAD), with the power setpoint for the generators settable by parameter or by analogue input.
  • The production in parallel to mains at variable power (IMPORT EXPORT, variable production on the generators to guarantee a fixed power on the mains), with power setpoint for the mains settable by parameter or by analogue input.
  • The loss of mains protections (interface protections), to isolate the generators from the mains in case of failure on the mains itself.
  • The LOAD SHEDDING function (non-priority loads disconnection), with 4 available levels.
  • The PEAK SHAVING and PEAK LOPPING functions (start of generators due to excessive consumption of the loads from the mains).
  • Taking advantage of the internal calendar clock (with rechargeable backup battery):
    • Periodical genset’s start-up with programmable rate, in order to verify their efficiency (this test can be done without load, in parallel to the mains or in island mode by transferring the loads from the mains to the generators).
    • Selectable days and time intervals in which the generators must never be started.
    • Selectable days and time intervals in which the generators must be started even if the mains is present.
    • Periodical and “on-event” history logs.
  • Embedded alarm horn.
  • Interface protections (parallel to mains)

    • Under voltage (27).
    • Under voltage with time dependent on voltage level (27T).
    • Under voltage linked to imported reactive power (27Q).
    • Over voltage (59).
    • Under frequency (81U).
    • Over frequency (81O).
    • ROCOF (df/dt, 81R).
    • Vector jump.

    Mains protections (for emergency service)

    • Under frequency (81U).
    • Over frequency (81O).
    • Under voltage (27).
    • Over voltage (59).
    • Voltage unbalance (46).
    • Wrong phases sequence.

    Other protections

    • Minimum exported power to the mains (32).
      Max. current (50, 51, 50V, 51V)
      High/low supply voltage.

Reviews

There are no reviews yet.

Be the first to review “SICES-MC 400”

Your email address will not be published. Required fields are marked *

Scroll to Top